/ PROJECT CASE STUDYCompleted

Padma Bridge — Two Geo Bag Warehouses

Construction of two Geo Bag warehouses at the Janjira end of the Padma Multipurpose Bridge area.

Evidence statusCompleted-work record cross-checked against the supplied project schedule. · Last verified 8 September 2026
CLIENT / AUTHORITY
Bangladesh Bridge Authority
LOCATION
Janjira end, Padma Multipurpose Bridge
SCOPE
Construction of two Geo Bag warehouses at the Janjira end of the Padma Multipurpose Bridge area.
DELIVERY STATUS
Completed
COMPLETION DATE
13 May 2025
CONTRACT VALUE
BDT 59,520,156.22
Padma Bridge — Two Geo Bag Warehouses — representative construction image
REPRESENTATIVE CONSTRUCTION IMAGE

Construction of two Geo Bag warehouses at the Janjira end of the Padma Multipurpose Bridge area.

Record source: DGB Work List.pdf — entry 13, profile page 25