Our project controls connect people, plant, environment and quality from pre-mobilisation review through documented handover.
01 / POLICY STATEMENT
Prevent harm. Protect the environment. Deliver to specification.
DG Bangla Engineering Ltd is committed to providing working conditions that protect employees, subcontractors, visitors, communities and the environment. Every project is expected to identify hazards, assess risk, assign controls and verify that the work is ready before execution begins.
Quality is managed through approved information, competent supervision, inspection points, testing and traceable records. Project-specific contractual requirements take precedence over this public policy summary.
02 / CORE COMMITMENTS
Six controls applied to every work package.
01
Hazard identification
Task-level hazards are reviewed before work and when conditions change.
02
Competence and supervision
Roles, authorisations and supervision are matched to the task and equipment.
03
Plant and equipment safety
Inspection, maintenance, guarding and authorised operation are built into mobilisation.
04
Environmental protection
Waste, spill, dust, noise, water and material controls follow the approved project plan.
05
Quality assurance
Drawings, materials, method statements, inspection points and tests are controlled.
06
Learning and improvement
Unsafe conditions, non-conformities, incidents and near misses are reported and reviewed.
03 / PROJECT CONTROL CYCLE
From mobilisation gate to controlled handover.
01Pre-mobilisation risk, access and interface review
02Method statement, permits and toolbox briefing
03Supervised execution, inspection and test records
04Close-out, lessons learned and handover
WORKPLACE CONTROL
Field execution requirements
Risk assessment / JSA and approved method
Permit-to-work where the project requires it
Induction, toolbox talk and daily coordination
PPE, access, lifting and work-at-height controls
Emergency contacts, first-aid and evacuation readiness
Stop-work authority for unsafe conditions
ENVIRONMENT
Environmental management
Waste segregation and authorised disposal
Fuel, chemical and spill controls
Dust, noise and community-interface management
Water, dredging and disposal controls where applicable
Material efficiency and protected work boundaries
Incident reporting and corrective action
QUALITY
Inspection and assurance
Current drawings, BOQ and specification control
Material source and technical submittal approval
Inspection and test-plan hold points
Survey, testing and measurement records
Non-conformity and corrective-action tracking
As-built, O&M and handover documentation
04 / REPORTING & ACCOUNTABILITY
Raise concerns early. Record actions clearly.
Project personnel are expected to report unsafe conditions, environmental events, near misses, incidents and quality non-conformities through the site reporting line. Urgent risks should be made safe first and escalated immediately.